Project

Waterhouse Gardens.

Client
Salboy
Location
Manchester
Status
Complete

Waterhouse Gardens is a landmark development situated a short distance from central Manchester, strategically connecting the vibrant Greengate and N.O.M.A neighbourhoods with the historic Medieval Quarter.

As one of the largest and most exciting regeneration initiatives in the city, Waterhouse Gardens reimagines the former Boddington Brewery site, aligning with the ambitious vision outlined in the Great Ducie Street Regeneration Masterplan. This transformative project will set a new benchmark for urban living and revitalisation in Manchester.

Matic is delivering a full M&E fit-out to 556 luxurious high-spec apartments, duplexes, and penthouses. This meticulous integration of modern engineering ensures the project’s seamless operation while setting new standards for quality and comfort.

Waterhouse Gardens is more than just a development; it’s a bold statement of Manchester’s future, blending innovation with community-centric design to create a thriving, connected urban environment

Key Project Details.

  • Commercial Plant Rooms
  • Domestic & Commercial Services Installation
  • Above Ground Drainage and Rainwater
  • Smoke Vent Systems
  • Ventilation and HVAC Systems
  • Residential and Commercial Sprinkler Systems

Sectors Covered.

MWjan26-108801
Integrated Fire & Security Systems Delivery – Waterhouse Gardens

Matic was appointed to deliver a full fire and security systems package at Waterhouse Gardens, a large-scale mixed-use residential development comprising five residential blocks and one retail block. Our scope included the design, installation, commissioning, certification, and handover of all life safety and security systems in accordance with the approved Fire Strategy, relevant British Standards, and the Building Safety Act 2022. Fire detection and alarm works comprised a fully networked fire alarm system designed to Category L5 within residential corridors for AOV activation, with Category L1 detector spacing and Category L2 coverage within amenity areas, fully integrated with AOVs, plant systems, access-controlled doors, and life safety interfaces. The works included visual and audible alarm devices, battery back-up, remote signalling, soak testing, and full system certification.

In addition, Matic delivered a networked Emergency Voice Communication System (EVCS) to support disabled refuge and WC alarm requirements, alongside a Paxton Net2 access control system and Comelit audio and video intercom system providing controlled access, concierge functionality, and fail-safe operation integrated with the fire alarm system. A Hikvision IP CCTV system was installed to provide 24/7 surveillance across perimeters, residential corridors, amenity spaces, cycle stores, and bin stores, supported by a dedicated standalone security network incorporating fibre backbone infrastructure, PoE switching, and secure data cabinets. All systems were fully tested, commissioned, and handed over with as-built documentation, O&M manuals, certification, and end-user training, delivering a fully compliant and integrated solution ready for occupation.

Related News.

Waterhouse Gardens' pool and spa area

Matic Appointed to Deliver Planned MEP Maintenance at Waterhouse Gardens

February 13, 2026

Read More
7

Matic has officially handed over Tib House and Irk House at Waterhouse Gardens

November 15, 2025

Read More

More Projects.

VIEW SERVICE
VIEW PROJECT
READ BIO